Start 30 days free, no card. Full Pro access for a month, then decide. Start free
Analyst
Eric Luebchow
Period: Reporting periods mapped to calendar 2024 Q4 – 2026 Q2 (7 quarters).
- Questions
- 61on tracked calls
- Challenge rate
- 5%3 of 61 questions
- Companies
- 9questioned at least once
- Reporting periods
- 7with questions
These figures cover the whole profile: every tracked question, all reporting periods.
How to read these numbers
Challenge rate is the share of questions that pushed back, pressed for specifics or questioned management’s assumptions. It describes how questions were asked on the calls tracked here; it does not measure whether any view turned out to be right.
Rounding. Rates are rounded to whole percentages, so a small share can show as 0% even when some questions were challenging. The count beside each rate is exact; “none of N questions” means no question was challenging.
No questions recorded. “—” means there is nothing to calculate: no questions were recorded for that period on the calls tracked here. It does not mean there was no activity.
Fewer than 3 questions. A company-level rate is withheld when fewer than 3 questions were recorded for that company; the questions are still counted everywhere else.
Small samples. Profiles with fewer than 10 questions are marked Limited sample.
Reporting periods. Questions are grouped by the calendar quarter each company’s fiscal reporting period maps to, not by the date of the call. Periods without a calendar mapping are listed separately under their fiscal label.
Questions asked
Grouped by company, most questions first. Open a company to read its questions, newest reporting period first.
Showing 61 of 61 questions from 9 companies
PSAPublic Storage10 questions · 5 reporting periods · 0 of 10 challenging
Calendar 2026 Q1
Can you talk about top-of-funnel demand—web search, in-store traffic—and whether recent volatility in mortgage rates
Show response
Management noted mixed top-of-funnel by geography with strong coastal/Midwest and softer supply-heavy Sunbelt but net positive pricing dynamic
Given the size and complexity of NSA, does it impact your willingness to pursue larger, more complex portfolios
Show response
Management noted brief pause for NSA Q3 closing window but continued deployment for one-off acquisitions throughout 2026
Calendar 2025 Q4
Your development deliveries have slowed down a bit the past couple of years, down to $300 million this year
Show response
Boyle acknowledged fewer deliveries due to rising costs and rent pressure in high-growth markets, but development remains a strong risk-adjusted return and a focus of the value creation engine.
how are you thinking about that, how that may evolve over the next couple of years as a lot of these models become more and more ubiquitous?
Show response
Boyle noted consumers increasingly using LLMs and PSA investing in AI agents across website, app, and customer interactions. Plans to share more over the next 6-12 months.
Calendar 2025 Q3
you had guided to about 100 basis point headwind. So maybe you could just update us on what you're expecting kind of as we look into Q4
Show response
Boyle noted LA revenue now expected down 1-2% for the year vs prior down 3%, with the recent ICE-related state of emergency having negligible impact on Q4.
could you update us a little bit on operating trends through October in terms of occupancy moving rates?
Show response
Boyle provided detailed October data: new customer revenue down slightly less than 9%, move-in rates down 10-11% but volume up 3-4%, occupancy gap at -40bps.
Calendar 2025 Q2
are you optimistic that we won't see the same level of price competition to try to maintain occupancy?
Show response
Tom expects similar seasonal trends as 2024 with continued competitive dynamics for new customers.
promotional discounts have been down year-to-date versus last year and your marketing spend was up a bit
Show response
Tom reiterated revenue maximization as the goal, with all three levers, marketing, promotions, move-in rates, used granularly at the property/product level.
Calendar 2025 Q1
are there opportunities out there in other developed international markets given your experience with Shurgard
Show response
Joe confirmed ongoing study of international markets. PSA looks for scale, existing platform, and ability to infuse operational capabilities.
are you kind of in line or running ahead of internal expectations at this point on occupancy?
Show response
Tom confirmed occupancy tracking right in line with the midpoint assumption of down 10bps on average.
AMTAmerican Tower9 questions · 5 reporting periods · 2 of 9 challenging
Calendar 2026 Q2
we also read that Vodafone in Spain is moving some infrastructure of competitor sites to you in 2028.
Show response
Declined to confirm the specific agreement but gave broader Europe color, reiterating mid-single-digit organic growth anchored by Telefonica.
are you seeing any impact from that, whether that's in the services business or perhaps new bookings for colos
Show response
Denied any slowdown and Smith reaffirmed the $245 million services revenue outlook, noting it is slightly front-end loaded.
Calendar 2026 Q1
do you think longer term, CoreSite makes sense within the American Tower family? Or could there be something strategic that you would do with it to potentially maximize value
Show response
Steve firmly positioned CoreSite as long-term portfolio asset. Edge computing will finalize tower-data center synergies. Business performing well beyond acquisition underwrite expectations.
curious if there's any update you could provide on whether you think there's a real market that could develop there in the next couple of years
Show response
Steve highlighted wireless carriers now engaging with chip makers and cloud companies on Edge. Declined to predict timing again but sees momentum. Raleigh data center serves as Edge experimentation hub.
Calendar 2025 Q3
Any just kind of high-level commentary on how you think some of this additional spectrum could impact future densification demand
Show response
Steve said even software-push spectrum eventually drives densification as mobile data grows. Experts project capacity must double in 5 years, spectrum and technology solve about half, densification solves the rest. Rod added overall apps up ~20% YoY with colo apps up ~40%, beginning of densification shift.
Any update on them? It sounds like things are progressing as planned
Show response
Steve said always in dialogue with all customers about potential deals. On a la carte vs MLA: medium to long term, revenue flows either way, just more variable timing without MLA. Some revenue shifted into 2026 from timing but underlying demand unchanged.
Calendar 2025 Q2
I'm just curious what the mix is in your guide for this year, how that might trend after 2025
Show response
Rod quantified: colocations just over 10% of applications (~2,500-3,000 of 18,000+), up from recent past but still early days of densification. Rod laid out capital priorities: 1) fund dividend (~5% growth tracking AFFO), 2) $1.5-2B internal CapEx, 3) toggle between delevering, M&A (developed markets focus), and buybacks.
Calendar 2025 Q1
maybe you could just touch on what your sales funnel looks like within the data center business across the cloud companies and the more type of retail colocation companies
Show response
Steve emphasized CoreSite is interconnection-focused, not hyperscale. Enterprise demand for multi-cloud and AI tools remains robust with existing customers expanding and new customers seeking larger installations. Retail colo also strong. Demand expected durable despite hyperscale pullbacks and economic uncertainty.
maybe you could provide some color on any discussions with them on potentially moving into a new holistic agreement
Show response
Steve said AMT is agnostic between MLA and a la carte, whatever drives best long-term value. Always in dialogue with all customers. No negative or positive signal from absence of comprehensive MLA; just not the right structure for both parties currently.
CCICrown Castle7 questions · 4 reporting periods · 1 of 7 challenging
Calendar 2026 Q2
do you think it could create opportunity on your sites, particularly given that they're more urban in nature
Show response
On a potential SpaceX/StarLink mobile service, management said it was too early to speculate but noted its sites offer space, power and backhaul to serve any operator.
Calendar 2026 Q1
kind of cost efficiencies through SG&A and gross margins and getting your margins up 300 or 400 basis points over some period of time
Show response
CFO confirmed 200+ basis points additional margin improvement potential through 2030 via ground lease purchases (from 30% to 40% ownership) and platform/systems/automation investments.
what form that could take, how significant it could be? And what kind of returns do you think you could get on that?
Show response
CEO set expectations for small initial volumes with disciplined economics requiring multiple committed tenants. CCI sees opportunity given its size and scale advantage, but CapEx must clear return hurdles.
Calendar 2025 Q4
Maybe you could just talk about the flow through between SG&A and gross margin
Show response
CFO broke down $55M 2026 impact: ~$45M SG&A, ~$5M site rental COGS, ~$5M services. Run-rate $65M: ~$50M SG&A, ~$5M site rental COGS, ~$10M services.
maybe you could just talk through what gives you confidence there
Show response
CFO cited visibility into leasing activity, carrier spectrum purchases and deployment plans, and continued data demand growth. CEO added MLA visibility into future activity levels.
Calendar 2025 Q3
if you see anything kind of takes you off the expectation that you've talked about where you can grow kinda four to 5% organically pretty consistently
Show response
CFO deferred 2026 guidance to Q4 earnings but noted no change in colo/amendment mix and exciting developments with clients.
is there any reason why can't get SG&A efficiency or gross margins to kind of similar levels?
Show response
CFO listed multiple efficiency levers including systems, automation, and ground lease purchases over next 2-3 years, with biggest near-term benefit from simplification to one business.
DLRDigital Realty7 questions · 7 reporting periods · 0 of 7 challenging
Calendar 2026 Q2
talk through the balancing act between accretion on deals, continued growth and then capital funding
Show response
Mercier listed renewal execution, hyperscale leasing, 0-1 megawatt records and private capital fee income, but gave no specific accretion math for the announced deals.
Calendar 2026 Q1
can you talk about any incremental constraints around the supply chain
Show response
Power confirmed rent growth outpacing cost inflation despite incredible demand pressure on supply chains, labor, and certain regional shortages of skilled electricians.
Calendar 2025 Q4
Are you starting to see the hyperscalers look a little bit further out for power than they perhaps did in 2025?
Show response
Power confirmed hyperscalers looking further out, with seven consecutive quarters of different top signing customers and more customers competing for the same capacity blocks.
Calendar 2025 Q3
if you could talk about kind of the diversity of hyperscalers you're talking to
Show response
Power confirmed large capacity block deals skew toward established investment-grade hyperscalers; Mercier expects CapEx to increase in 2026 with broader portion in private capital.
Calendar 2025 Q2
I wanted to get your sense for kind of the large capacity block market in hyperscale in the U.S.
Show response
McLean confirmed very active hyperscale conversations around Northern Virginia capacity coming online, with pipeline as strong as ever and demand tilted towards North America.
Calendar 2025 Q1
I just wanted to confirm you're not really seeing that at this point
Show response
Power highlighted Q1 0-1MW pacing 10% above prior year's record pace; McLean confirmed largest 0-1MW pipeline on record with strong partner contribution at 33%.
Calendar 2024 Q4
maybe you could -- maybe touch a little bit on the potential mix of outright dispositions, JVs, and then new programmatic fund-like structures
Show response
CFO outlined $300-400M in non-core dispositions and remainder toward private capital expansion, with the fund described as the next logical step going very well.
EQIXEquinix7 questions · 6 reporting periods · 0 of 7 challenging
Calendar 2026 Q2
I just wanted to get your view on the long term guidance raise. Obviously a huge change from last year
Show response
CEO gave the demand and execution drivers and the CFO added the top 25 metro concentration, but neither addressed the MRR per cabinet versus billable cabinet mix directly.
Calendar 2025 Q4
Are you seeing more of these, you know, kind of coming from traditional enterprise companies adopting AI? Is it coming more from the hyperscalers
Show response
Adaire detailed that of the 60% AI deals, nearly half came from non-cloud enterprises including retail, manufacturing, and financial services. 11 liquid cool deployments in Q4 with 5 in NYC for FSI customers.
Calendar 2025 Q3
Are you seeing firm pricing or improving pricing just based on some of the capacity constraints we see in the market?
Show response
Adaire confirmed very firm pricing with no dilution. Keith outlined 2026 positives: lower cost to borrow than Analyst Day assumptions, ability to raise capital in lower-cost markets, and increasing interest capitalization.
Calendar 2025 Q2
maybe you could give us an update on your thoughts on how quickly you can stabilize some of the properties that you're planning to develop
Show response
Adaire cited three accelerators: single-phase builds, larger enterprise footprint requirements, and presales activity enabling de-risking. All should shorten stabilization vs historical 2-4 year timeline.
Calendar 2025 Q1
Maybe you could just update us on the progress of the U.S. xScale JV. I know you have a site in Atlanta with more sites under consideration
Show response
Adaire confirmed xScale pipeline unchanged with strong pre-leasing, Hampton progressing, and ~$40M SG&A investment planned for xScale growth. Keith noted NRR would step down in Q2 then recover in Q4.
Calendar 2024 Q4
Any update on where you think that settles back to the kind of lower 2% end of the range on a sustainable basis?
Show response
Adaire detailed churn analytics showing interconnected and multi-regional customers have lower churn propensity, guiding 2-2.5% range for 2025 with focus on increasing interconnection attachment.
Maybe you could talk a little bit about what your forward pipeline looks like today? And you mentioned in your prepared remarks pursuing kind of a larger end
Show response
Adaire highlighted strongest non-Tier 1 metro volumes from tech service providers seeking large contiguous footprints, with positive pricing trends across Tier 2 locations.
SBACSBA Communications7 questions · 5 reporting periods · 0 of 7 challenging
Calendar 2026 Q2
the majority of your activity levels today are coming from colos versus amendments
Show response
CEO tied future amendment activity to new spectrum deployments and said international churn is nearing the end of its elevated period.
Calendar 2025 Q4
could just remind us if you have any split between colos and amendments
Show response
Colocations dominating amendments in dollar terms. Upper C-band auction expected mid-2027 but deployment impact not until 2029-2030 after clearing. Near-term amendment activity from existing undeployed AWS/PCS spectrum massive MIMO upgrades and T-Mobile C-band.
maybe you could just update us on kind of longer-term expectations where you think net organic growth could get to domestically
Show response
Long-term 4-5% domestic organic growth: 3% escalators, 1% churn, 2-3% organic lease-up. Current year slightly below due to T-Mobile cycling and AT&T MLA structure. Expects recovery as competitive environment normalizes.
Calendar 2025 Q3
it looks like you'll be run rating at about, call it, $40 million-ish of domestic leasing going into '26. So I guess how do you feel about that level
Show response
Cavanagh declined to front-run 2026 guidance but expressed confidence new leasing activity will be in same range. DISH contribution only $2M this year, mostly first half, so negligible run-rate impact.
a lot of spectrum transactions announced recently between EchoStar and AT&T and SpaceX. So maybe you could just talk about monetization opportunities
Show response
Starlink terrestrial plans premature to discuss. AT&T 3.45 GHz upgrades may be mostly software. 600 MHz deployment timing and magnitude uncertain. Early to say whether meaningful upside exists.
Calendar 2025 Q2
what type of spread differential you think you could get on your debt versus potentially giving up flexibility to lever up
Show response
IG benefit mainly on unsecured paper; ABS debt already priced near IG. Not giving up much flexibility at current leverage. Domestic leasing run rate expected at $10-11M in back half, favorable for 2026.
Calendar 2025 Q1
Any sense for you have for how much might be related to regulatory requirements that certain carriers have
Show response
Regulatory requirements are a factor for at least one carrier (T-Mobile buildout obligations), but commercial needs also drive activity. Services uplift correlated with leasing activity on SBA's own sites.
Show 3 more companies
EXRExtra Space Storage6 questions · 3 reporting periods · 0 of 6 challenging
Calendar 2026 Q1
does it change at all, your strategy to consider maybe more potential asset sales or potentially buying back even more stock
Show response
Joe explained asset sales are portfolio optimization (typically short-term dilutive), won't accelerate as capital source. Buybacks: bought $140M in Q4 at ~$129, continued briefly in January, stopped when stock rose then halted due to MNPI. Will use the tool again when appropriate.
Just wanted to confirm that's still what you're expecting that's in line with your initial guide?
Show response
Joe confirmed 40bp headwind assuming full-year state of emergency. When lifted, will get right people around table and decide appropriate strategy based on facts at that time. Extensive post-COVID experience with emergency liftings.
Calendar 2025 Q2
It looks like you added 174 net. Talk about where you're seeing the strength from? And are you seeing any new opportunities from partners of the LSI portfolio
Show response
Joe credited LSI merger introductions and bridge loan relationships. Growth driven by difficult operating environment pushing private operators toward professional management.
I think you had talked about top of funnel demand measured by search on your last call being up year-over-year. So just wondering how it's trended the last couple of months
Show response
Joe noted search volume elevated vs prior years but partly AI-driven inflation. Don't see proportional website traffic increase. However, conversion rates higher suggesting better-educated customers.
Calendar 2025 Q1
last call you had talked about maybe some of your occupancy burning off throughout the course of the year. And that could give you a little bit more leverage in pricing.
Show response
Scott confirmed occupancy benefit expected to diminish in middle and back half of year, unchanged from prior quarter's commentary.
the $600 million in your updated guide, I guess, how should we think about the potential mix there between wholly-owned acquisitions or JV investments?
Show response
Scott pointed to press release table showing 27 of 28 forward properties are JVs. Joe noted market too quiet to establish clearing cap rates, each deal has unique circumstances.
IRMIron Mountain6 questions · 6 reporting periods · 0 of 6 challenging
Calendar 2026 Q2
Maybe you can talk a little bit about what the pipeline looks like beyond July for the rest of the year.
Show response
Meaney gave specific pipeline detail: 325 MW to energize over 24 months across Richmond, Europe and India, but noted large hyperscale deals are lumpy.
Calendar 2026 Q1
your comments around the new federal opportunities in your pipeline, you seem to really highlight this quarter
Show response
CEO confirmed second-best government bookings quarter ever, driven by digital-led efficiency transformations. Treasury contract on track at $9 million in Q1, $45 million for 2026, and $100 million annually from 2027. FedRAMP high authorization opens broader federal opportunities.
Calendar 2025 Q4
Can we maybe touch a little bit on the data center pipeline? Obviously, it is encouraging to hear you talk about a 100 megawatt plus opportunity ahead of you.
Show response
Bill detailed strong momentum from Q4 40MW leasing. Key markets: Northern Virginia, Richmond (225MW before 2027), Madrid, London, India. Hyperscalers shifting back to cloud and inference.
Calendar 2025 Q3
I wanted to kind of break down what you're seeing on volume versus price. We've seen a pretty significant increase in memory pricing recently
Show response
Barry confirmed ALM growth is volume-led, particularly enterprise volume which is higher-margin. Memory pricing up but component-by-component with varying velocity.
Calendar 2025 Q2
Do you think that a lot of this is just timing. And do you suspect that based on the power delivery time lines you have in places like Virginia
Show response
Barry confirmed no change in capital deployment, virtually all growth CapEx supports pre-leased construction. No speculative building.
Calendar 2024 Q4
talk about any longer-term implications from the DeepSeek announcement a few weeks ago, it kind of did create a lot of noise in the market
Show response
Bill dismissed DeepSeek impact, noting no hyperscaler CapEx reductions. Also explained passing on Q4 deal due to pricing discipline.
TMUST-Mobile US, Inc.2 questions · 2 reporting periods · 0 of 2 challenging
Calendar 2025 Q4
Maybe you could talk about kind of the pacing to get here as we look out in 2020 You've been adding close to 2 million new fixed wireless subs a year
Show response
Srini noted demand has consistently outrun phasing; 15M target is conservative excluding new spectrum and 6G efficiency; André described B2B opportunity as FWA complements Ethernet-to-SD-WAN technology transition, and SMRA expansion underway.
Calendar 2025 Q3
maybe you could talk a little bit about your spectrum positioning today. Obviously, one of your competitors announced a large deal
Show response
Srini said rigorous analysis showed densification cheaper than secondary market prices; intent to grow not just defend spectrum lead; John Saw detailed layered network advantages including more sites, denser grid, 5G advanced capabilities, and device performance leadership.
Challenge rate by company
Every company this analyst questioned, most questions first. A company-level rate is shown from 3 questions; below that it is withheld.
| Company | Questions | Challenge rate |
|---|---|---|
| PSA Public Storage | 10 | 0%none of 10 questions |
| AMT American Tower | 9 | 22%2 of 9 questions |
| CCI Crown Castle | 7 | 14%1 of 7 questions |
| DLR Digital Realty | 7 | 0%none of 7 questions |
| EQIX Equinix | 7 | 0%none of 7 questions |
| SBAC SBA Communications | 7 | 0%none of 7 questions |
| EXR Extra Space Storage | 6 | 0%none of 6 questions |
| IRM Iron Mountain | 6 | 0%none of 6 questions |
| TMUS T-Mobile US, Inc. | 2 | —Rate withheld: fewer than 3 questions |
- PSAPublic Storage · 10 questions0%none of 10 questions
- AMTAmerican Tower · 9 questions22%2 of 9 questions
- CCICrown Castle · 7 questions14%1 of 7 questions
- DLRDigital Realty · 7 questions0%none of 7 questions
- EQIXEquinix · 7 questions0%none of 7 questions
- SBACSBA Communications · 7 questions0%none of 7 questions
- EXRExtra Space Storage · 6 questions0%none of 6 questions
- IRMIron Mountain · 6 questions0%none of 6 questions
- TMUST-Mobile US, Inc. · 2 questions—rate withheld: under 3 questions
Activity by reporting period
Questions recorded for each calendar quarter that companies’ reporting periods map to (not the call date), with the challenge rate for that period. Periods inside the range with no questions are shown as “No questions recorded”.
| Calendar period | Questions | Challenge rate | Companies |
|---|---|---|---|
| 2024 Q4 | 4 | 0%none of 4 questions | 3 |
| 2025 Q1 | 9 | 0%none of 9 questions | 6 |
| 2025 Q2 | 9 | 0%none of 9 questions | 7 |
| 2025 Q3 | 12 | 8%1 of 12 questions | 8 |
| 2025 Q4 | 10 | 0%none of 10 questions | 7 |
| 2026 Q1 | 10 | 10%1 of 10 questions | 6 |
| 2026 Q2 | 7 | 14%1 of 7 questions | 6 |
- 2024 Q44 questions · challenge rate 0% (none of 4 questions) · 3 companies
- 2025 Q19 questions · challenge rate 0% (none of 9 questions) · 6 companies
- 2025 Q29 questions · challenge rate 0% (none of 9 questions) · 7 companies
- 2025 Q312 questions · challenge rate 8% (1 of 12 questions) · 8 companies
- 2025 Q410 questions · challenge rate 0% (none of 10 questions) · 7 companies
- 2026 Q110 questions · challenge rate 10% (1 of 10 questions) · 6 companies
- 2026 Q27 questions · challenge rate 14% (1 of 7 questions) · 6 companies
Topics
Topics tagged on this analyst’s questions.
- Demand33
- Capital Allocation11
- Revenue Growth10
- Competitive Dynamics9
- Capex Investment9
- Pricing9
- Cloud & AI7
- M&A6
- Regulation Policy5
- Geographic Expansion4
Show all 19 topics
- Margin4
- Cost Pressure4
- Innovation & R&D3
- Guidance Reliability2
- Supply Chain2
- Macroeconomic2
- Labor Market1
- Subscriber Growth1
- Credit1