Start 30 days free, no card. Full Pro access for a month, then decide. Start free
Analyst
Ross Fowler
Ross Fowler of Bank of America asked 39 questions on 19 earnings calls at 10 companies Tellvest tracks, from 2024 Q4 to 2026 Q3. Fowler's most common topics are Regulation Policy, Capex Investment and Capital Allocation, with the most questions at American Electric Power, Sempra and FirstEnergy. Fowler's most recent question was on Sempra's 2026 Q3 call, about Capex Investment.
Period: Reporting periods mapped to calendar 2024 Q4 – 2026 Q3 (8 quarters; questions recorded in 6).
- Questions
- 39on tracked calls
- Challenge rate
- 8%3 of 39 questions
What does “challenging” mean?
Percentage of questions scored as challenging, where the analyst pushed back, pressed for specifics, or questioned management's assumptions.
- Companies
- 10questioned at least once
- Reporting periods
- 6with questions
These figures cover the whole profile: every tracked question, all reporting periods.
How to read these numbers
Challenge rate is the share of questions that pushed back, pressed for specifics or questioned management’s assumptions. It describes how questions were asked on the calls tracked here; it does not measure whether any view turned out to be right. See how we grade analysts on earnings-call questions.
Rounding. Rates are rounded to whole percentages, so a small share can show as 0% even when some questions were challenging. The count beside each rate is exact; “none of N questions” means no question was challenging.
No questions recorded. “—” means there is nothing to calculate: no questions were recorded for that period on the calls tracked here. It does not mean there was no activity.
Fewer than 3 questions. A company-level rate is withheld when fewer than 3 questions were recorded for that company; the questions are still counted everywhere else.
Small samples. Profiles with fewer than 10 questions are marked Limited sample.
Reporting periods. Questions are grouped by the calendar quarter each company’s fiscal reporting period maps to, not by the date of the call. Periods without a calendar mapping are listed separately under their fiscal label.
Questions asked
Grouped by company, most questions first. Open a company to read its questions, newest reporting period first.
Showing 39 of 39 questions from 10 companies
AEPAmerican Electric Power9 questions · 4 reporting periods · 0 of 9 challenging
Calendar 2026 Q3
what is in there for batch zero? Is it anything? Is it a very small proportion of what left?
Show response
Dixon said Howard-Solstice is included and 85% of the AEP Texas plan is reliability work, with batch zero load treated as upside, but gave no batch zero figure.
is that sort of the expectation I should think about going forward as I look at modeling any new incremental CapEx?
Show response
Mihalik declined to commit to a ratio, citing $55 billion of cash generation, equity forwards and accretive issuance against an industry norm of 30% to 40%.
Calendar 2025 Q3
talking about $5.9 billion of equity in the plan. How are you thinking about the composition of the business? Do you think there's more potential for minority stake sell-downs?
Show response
Mihalik detailed ~33% equity for the $18B capital increase. ~$1B ATM in 2026, then no equity needed mid-plan, with block or ATM in back years. Fehrman confirmed no asset sales planned to fund the plan going forward.
that looks like a pretty big earnings step-up as I look at the CAGR going out on the bars in 2028. Can you just kind of maybe Trevor, walk through the drivers of that?
Show response
Mihalik explained mid-plan CapEx peaks at ~$17B driving the earnings step-up. Positive legislative outcomes in Ohio (forward test year), Texas (HB5247), and Oklahoma (SB998) also contribute to the acceleration in 2028.
Calendar 2025 Q2
the overall trajectory on the ROE trend from that 9.3% should push higher as well, if I think about that correctly
Show response
Mihalik confirmed Texas UTM should improve AEP Texas earned ROEs by 50-100 basis points from current 8.6%. Oklahoma SB998 will similarly help PSO's 8.3% earned ROE.
can you give us some color on the financing needs and the option for that incremental $16 billion?
Show response
Mihalik emphasized no near-term equity needs given pre-funding. Will use hybrids, growth equity, and growing operational cash flows. Formal financing plan at Q3 call.
Calendar 2024 Q4
Did you have a scaling of that versus the $2 billion you need in the current plan, or have you sort of not walked through all of that yet?
Show response
Michalek indicated securitization could cover a significant portion of the $2B remaining equity need if approved, benefiting both customers (lower rates) and AEP (filling the capital gap).
in that tariff, you know, have you disclosed what that rate is versus maybe other industrial commercial rates? Is it, like, a minimum power take requirement
Show response
Fehrman explained tariffs are project-specific cost allocations with multi-year commitments. Ohio tariff is data-center-specific while Indiana covers all large loads. Growth continues despite tariffs.
we've sort of seen, like, this idea where, you know, the off-taker would put in a significant portion of the capital and take more of the risk into that project?
Show response
Fehrman emphasized disciplined approach to SMR risk: filed DOE applications for two sites but far from firming up structures. Technology providers must back their product at an understandable price.
SRESempra9 questions · 4 reporting periods · 0 of 9 challenging
Calendar 2026 Q3
Like, what is in the 20% up upside you are talking about? And is that $7.65, or could that revert to $3.45?
Show response
Three drivers: the 1 year roll forward, customer load growth, and projects moved from the incremental bucket; the 765 step program and SRP stay outside.
And sort of the range of outcomes that are possible there and how much the headwind that actually is to your 2027?
Show response
Sized the issue as a $188 million revenue requirement, called it a correctable error confined to 2027, with a new GRC starting in January 2028.
Calendar 2025 Q2
does that mean to the extent you will or are discussing stake sales with third parties beyond the current investors that the strategic approach here on business mix is that the full stake is beyond...
Show response
Jeff outlined four value drivers (equity value, tax leakage, timing/use of proceeds, balance sheet cushion) but declined to guide to a higher equity sale level, noting flexibility to maximize value.
The incremental capital in Oncor in Texas and the transmission awards that you talked about in the deck, those are still outside the base plan with CCM coming in '27. How do you see the timing of a...
Show response
Jeff confirmed the $12B incremental CapEx is likely conservative, with a Board review in October and formal update sometime in 2026, driven by resolution of the base rate review.
Calendar 2025 Q1
Can you maybe talk about something in that program a little bit more specifically, like what you've achieved
Show response
Jeff detailed voluntary retirement programs, AI-driven call center improvements, and noted Oncor has lowest rates among Texas IOUs.
What would be the advantages or disadvantages of doing the rest of that 765 or 345
Show response
Allen explained 765 kV provides superior operational benefits including fewer right-of-ways and flexible generation siting, and Oncor owns over 1,300 endpoints.
KKR would be due on May 12th. And then we've got, if I've got it right, 10 business days for ADIA
Show response
Jeff clarified the sequential ROFR process and confirmed Q2 call as the appropriate time for an update.
Calendar 2024 Q4
if I think about 7% to 9%, I'm just trying to think about the right base here. Should I think about that 7% to 9%, or now you're saying 9% off the 2026 base
Show response
Jeff clarified the 7-9% is a long-term sustained rate over 7-10 years, while within the 2025-2029 plan they expect to be at or above the high end.
Just trying to understand kind of the moving pieces and maybe the magnitude of the moving pieces a little bit
Show response
Karen detailed the California GRC coming in below expectations, the FERC ISO adder ($20M impact), cost of capital decrease ($50M), and Oncor rate case timing as key drivers.
FEFirstEnergy5 questions · 3 reporting periods · 0 of 5 challenging
Calendar 2026 Q1
you've got the NOPR out there, the colocated load order and the backstop procurement
Show response
Tierney wants large loads paying utility directly with utility earning return, similar to natural gas pipeline open season model. Opposes PJM as middleman in backstop procurement.
Calendar 2025 Q3
how are you thinking about the supply chain connected to that 1.2 gigawatts? Do you have a turbine in the queue
Show response
Tierney noted 3-4 year lead times (better than feared 4-5), haven't secured queue position yet but confident in regulatory framework to deliver by 2031.
How are you thinking about sort of the affordability pressures in that state
Show response
Tierney acknowledged political sensitivity despite understanding that generation is the driver; focused on O&M discipline and advocating against capacity auction costs.
Calendar 2025 Q2
How do you see those progressing from here? And when can we finally think about wrapping and closing that
Show response
Tierney confirmed no new issues raised in HB6 hearings, expects to put final period on proceedings by year-end.
what intervenors seem most concerned about through that process? And how would that shift your ability to have an opportunity to earn your allowed ROE
Show response
Tierney expects next rate case under new regime will be straightforward with limited historical review period and true-up mechanisms.
NINiSource3 questions · 2 reporting periods · 0 of 3 challenging
Calendar 2026 Q3
I think if I have got it right, Amazon CCGT is shifting out to 2030, Kind of what drove that How will you serve Amazon
Show response
Operator intro garbled as Christopher Jeffrey with Bank of America, then opened the line for Ross; transcript labels this turn Lloyd Yates. One CCGT moved, offset by batteries and pool assets.
CapEx really is not changing on a sort of annualized basis, but I think this is the important point maybe is that
Show response
Confirmed the base business can run with minimal to no equity and GenCo cash flows can be shaped to balance financing; transcript labels the question inside Shawn Anderson's turn.
Calendar 2025 Q1
what you guys see as the advantage of the Genco structure
Show response
Lloyd provided four clear advantages: cost separation for customer protection, faster speed to market (bypassing 240-day CPCN), flexibility in risk/return negotiation, and preserving base business model.
PCGPG&E Corporation3 questions · 1 reporting period · 1 of 3 challenging
Calendar 2026 Q3
I am just trying to check-in and make sure that really has no bearing on your finance plan credit objectives
Show response
Burke confirmed the faster wildfire fund amortization is an accounting charge with no bearing on financing or credit objectives.
Can you do it on your own? Does it depend on legislative and regulatory outcomes? And is 14% kind of what we should mark
Show response
Poppe called investment grade realistic and said the target is mid teens FFO to debt, but gave no timeline and said structural options need regulators.
So what gives you the level of certainty that there is no equity needed business through 2030
Show response
Poppe said equity was funded for the original $73 billion plan and any alternative would be sized to it; Burke said PG&E would not issue equity at this valuation.
CNPCenterPoint Energy2 questions · 1 reporting period · 0 of 2 challenging
Calendar 2026 Q3
Can you kind of, maybe kick off or check box why you have such confidence in that versus the audit parameters
Show response
Said these customers have worked with the company for a year or more and were already meeting the audit's requirements.
Temporary generation, are you meaning any particular way lease versus sale there?
Show response
Kept both options open; units return by the end of March 2027 and either path gives a cash tailwind.
Show 4 more companies
DTEDTE Energy2 questions · 1 reporting period · 1 of 2 challenging
Calendar 2026 Q3
you are taking that $0.50 of kind of upfront dilution, and now we have a higher growth rate off of that to the back end
Show response
CEO agreed with the multiple framing and cited regulated focus, lower equity and debt needs, and better earnings visibility.
how do I think about the timing of using those proceeds and redeploying the capital at the utility?
Show response
CFO said proceeds go to retiring 2027 parent debt and reducing equity, so the benefit shows up quickly.
ESEversource Energy2 questions · 1 reporting period · 0 of 2 challenging
Calendar 2024 Q4
we've seen the DPU has put out this proposal to end most gas line extensions. Does that shift your capital plan
Show response
Nolan declined to comment on the gas line extension proposal, saying it was too new and they were formulating their response.
there's some legislative efforts in Connecticut to talk through or at least think about the statutory changes that were made around the Aquarion sale
Show response
Nolan expressed confidence in the sale, noting the same legislature enacted the enabling law seven months ago and the governor signed it.
ETREntergy2 questions · 1 reporting period · 0 of 2 challenging
Calendar 2025 Q2
can you kind of just contextualize, give us some color around what were, from your perspective, the main intervenor concerns through that process
Show response
CEO detailed customer bill impacts and reliability as main concerns. Highlighted cost-sharing benefits and resilience improvements from 500 kV transmission investments. No party disputes need for capacity.
Can you remind us of what the next phase of that process is? And would we get updates on that?
Show response
CEO confirmed fall MTEP submittal with potential updates at that time. Current plan includes $5.6 billion reviewed through MISO's MTEP process.
XELXcel Energy2 questions · 1 reporting period · 1 of 2 challenging
Calendar 2026 Q1
One of the things that maybe the market has been thinking about because we're focused on growth, growth, growth and more growth is sort of the layer of execution risk
Show response
CEO detailed 24 gas turbines secured, plus framework agreements with EPC vendors and equipment suppliers across all business lines. CFO emphasized scale benefits.
do you see potential to expand that beyond 2 gigawatts? How are you thinking about expanding that
Show response
CEO confirmed the JDA has no cap and could serve all generation needs for large loads, though it remains non-exclusive.
Challenge rate by company
Every company this analyst questioned, most questions first. A company-level rate is shown from 3 questions; below that it is withheld.
What does “challenging” mean?
Percentage of questions scored as challenging, where the analyst pushed back, pressed for specifics, or questioned management's assumptions.
| Company | Questions | Challenge rate |
|---|---|---|
| AEP American Electric Power | 9 | 0%none of 9 questions |
| SRE Sempra | 9 | 0%none of 9 questions |
| FE FirstEnergy | 5 | 0%none of 5 questions |
| NI NiSource | 3 | 0%none of 3 questions |
| PCG PG&E Corporation | 3 | 33%1 of 3 questions |
| CNP CenterPoint Energy | 2 | —Rate withheld: fewer than 3 questions |
| DTE DTE Energy | 2 | —Rate withheld: fewer than 3 questions |
| ES Eversource Energy | 2 | —Rate withheld: fewer than 3 questions |
| ETR Entergy | 2 | —Rate withheld: fewer than 3 questions |
| XEL Xcel Energy | 2 | —Rate withheld: fewer than 3 questions |
- AEPAmerican Electric Power · 9 questions0%none of 9 questions
- SRESempra · 9 questions0%none of 9 questions
- FEFirstEnergy · 5 questions0%none of 5 questions
- NINiSource · 3 questions0%none of 3 questions
- PCGPG&E Corporation · 3 questions33%1 of 3 questions
- CNPCenterPoint Energy · 2 questions—rate withheld: under 3 questions
- DTEDTE Energy · 2 questions—rate withheld: under 3 questions
- ESEversource Energy · 2 questions—rate withheld: under 3 questions
- ETREntergy · 2 questions—rate withheld: under 3 questions
- XELXcel Energy · 2 questions—rate withheld: under 3 questions
Activity by reporting period
Questions recorded for each calendar quarter that companies’ reporting periods map to (not the call date), with the challenge rate for that period. Periods inside the range with no questions are shown as “No questions recorded”.
What does “challenging” mean?
Percentage of questions scored as challenging, where the analyst pushed back, pressed for specifics, or questioned management's assumptions.
| Calendar period | Questions | Challenge rate | Companies |
|---|---|---|---|
| 2024 Q4 | 7 | 0%none of 7 questions | 3 |
| 2025 Q1 | 4 | 0%none of 4 questions | 2 |
| 2025 Q2 | 8 | 0%none of 8 questions | 4 |
| 2025 Q3 | 4 | 0%none of 4 questions | 2 |
| 2025 Q4 | No questions recorded | — | — |
| 2026 Q1 | 3 | 33%1 of 3 questions | 2 |
| 2026 Q2 | No questions recorded | — | — |
| 2026 Q3 | 13 | 15%2 of 13 questions | 6 |
- 2024 Q47 questions · challenge rate 0% (none of 7 questions) · 3 companies
- 2025 Q14 questions · challenge rate 0% (none of 4 questions) · 2 companies
- 2025 Q28 questions · challenge rate 0% (none of 8 questions) · 4 companies
- 2025 Q34 questions · challenge rate 0% (none of 4 questions) · 2 companies
- 2025 Q4No questions recorded
- 2026 Q13 questions · challenge rate 33% (1 of 3 questions) · 2 companies
- 2026 Q2No questions recorded
- 2026 Q313 questions · challenge rate 15% (2 of 13 questions) · 6 companies
Topics
Topics tagged on this analyst’s questions.
- Regulation Policy15
- Capex Investment14
- Capital Allocation11
- Demand7
- M&A5
- Guidance Reliability5
- Credit4
- Supply Chain2
- Cloud & AI2
- Revenue Growth2
Show all 14 topics
- Margin2
- Innovation & R&D2
- Macroeconomic1
- Cost Pressure1