Calendar quarter Q3 2025Earnings call Nov 18, 2025
FY2025 Q3 in brief
Freeport held a special update call dominated by the September 8th mud rush at the Grasberg Block Cave, which killed seven workers and forced a suspension of all operations there.
| Company | Score | Trend | Rev YoY |
|---|---|---|---|
| FCXFreeport-McMoRan | 5 | +2.7% | |
| SCCOSouthern Copper Corporation | 9 | +15.2% |
FY2025 Q2 to FY2026 Q3
GAAP revenue YoY +2.68% → base 5. The base score is anchored to the GAAP revenue YoY band before transcript, EPS, and guidance adjustments.
September 8th unprecedented mud inrush from surface connected to draw point in PB1C, traveling to multiple underground levels. Seven coworkers were found deceased on the service level. All Grasberg operations temporarily suspended.
September 8th unprecedented mud inrush from surface connected to draw point in PB1C, traveling to multiple underground levels.
PB2 and PB3 targeted to restart in Q2 2026 after cement plug installation. PB1 South restart targeted mid-2027 due to damaged ore chutes. PB1C deferred to end of 2027. Production in 2026 expected similar to 2025 with significant increases in 2027-2029.
PB2 and PB3 targeted to restart in Q2 2026 after cement plug installation.
Leach initiative targeting 300 million pounds in 2026 at less than $1 per pound incremental cost. Morenci additive trial producing 50% more than expected. Heat trials at El Abra operational in second half of 2026. Long-term target of 800 million pounds by 2030.
Leach initiative targeting 300 million pounds in 2026 at less than $1 per pound incremental cost.
Capital expenditures for 2025-2026 approximately $800 million below July estimates with deferrals into 2027+. $250 million placeholder for equipment damage. Property and business interruption insurance coverage of up to $700 million for underground losses.
Capital expenditures for 2025-2026 approximately $800 million below July estimates with deferrals into 2027+.
Muon cosmic ray particle imaging technology being deployed for cave shape and material flow monitoring. Hammer drills ordered for accelerated mud drainage from surface. Diamond drilling already underway from underground access drifts.
Muon cosmic ray particle imaging technology being deployed for cave shape and material flow monitoring.
New Indonesia gold tax policy announced but details not yet known. Mitigated by domestic gold sales through precious metals refinery to Mine ID subsidiary and stabilized royalty terms within IUPK license.
New Indonesia gold tax policy announced but details not yet known.
Positive copper demand trends from electrification, technology, and energy infrastructure. Americas business entering growth period with Bagdad mine doubling and Safford-Lone Star and El Abra projects.
Positive copper demand trends from electrification, technology, and energy infrastructure.
Management laid out a phased restart, with production blocks PB2 and PB3 targeted for the second quarter of 2026, PB1 South for mid-2027, and PB1C deferred to the end of 2027; 2026 output is expected to be similar to 2025 before significant increases across 2027 to 2029.
Reported revenue still rose about 4% year over year for the quarter, reflecting results largely before the incident, and management guided EBITDA to approach $12 billion in 2026 and operating cash flow to roughly $8 billion, with up to $700 million of insurance coverage as potential upside. Away from Indonesia, the Americas leach initiative is on track to scale to 300 million pounds in 2026 from about 200 million currently, a low cost growth lever alongside the Bagdad expansion and El Abra project.
FY25 Q3, sector-relative: EV/Sales 8.8x (37th).
| Company | Q2 2024 | Q3 2024 | Q4 2024 | Q1 2025 | Q2 2025 | Q3 2025 |
|---|---|---|---|---|---|---|
| FCX | No score | No score | 3 | 2 | 7 | 5 |
| SCCO | No score | No score | 9 | 9 | 4 | 9 |
Percentage of questions scored as challenging, where the analyst pushed back, pressed for specifics, or questioned management's assumptions.
Supply Chain | Cost Pressure | Capex Investment | Innovation & R&D | Regulation Policy | Revenue Growth | Guidance Reliability | Capital Allocation | |
|---|---|---|---|---|---|---|---|---|
| 2024Q4 | 2 | 2 | 6 | 2 | 5 | 1 | 3 | |
| 2025Q1 | 2 | 4 | 2 | 3 | 3 | 1 | 2 | |
| 2025Q2 | 5 | 2 | 5 | 2 | 3 | 1 | 3 | 2 |
| 2025Q3 | 10 | 6 | 3 | 6 | 2 | 1 | ||
| 2025Q4 | 3 | 3 | 2 | 3 | 1 | 3 | 1 | 1 |
| 2026Q1 | 9 | 6 | 1 | 3 | 2 | 5 | ||
| 2026Q2 | 1 | 1 | 3 | 1 | 2 | 5 | 1 | 2 |
| '24Q4 | '25Q1 | '25Q2 | '25Q3 | '25Q4 | '26Q1 | '26Q2 | |
|---|---|---|---|---|---|---|---|
| Supply Chain | 2 | 2 | 5 | 10 | 3 | 9 | 1 |
| Cost Pressure | 2 | 4 | 2 | 6 | 3 | 6 | 1 |
| Capex Investment | 6 | 2 | 5 | 3 | 2 | 1 | 3 |
| Innovation & R&D | 2 | 3 | 2 | 6 | 3 | 3 | 1 |
| Regulation Policy | 5 | 3 | 3 | 2 | 1 | 2 | 2 |
| Revenue Growth | 1 | 1 | 1 | 3 | 5 | ||
| Guidance Reliability | 3 | 1 | 1 | 5 | 1 | ||
| Capital Allocation | 3 | 2 | 2 | 1 | 2 |
The table scrolls sideways. Swipe it, or select it and use the arrow keys.
| Quarter | Revenue | Rev YoY | EPS | EPS YoY | Op margin | Net margin | FCF |
|---|---|---|---|---|---|---|---|
| FY2024 Q4 | $5.72B | -3.1% | $0.19 | -29.6% | 21.7% | 4.8% | $197M |
| FY2025 Q1 | $5.73B | -9.4% | $0.24 | -25.0% | 22.7% | 6.1% | -$114M |
| FY2025 Q2 | $7.58B | +14.5% | $0.53 | +26.2% | 32.1% | 10.2% | $934M |
| FY2025 Q3Selected | $6.97B | +2.7% | $0.46 | +27.8% | 28.3% | 9.7% | $608M |
| FY2025 Q4 | $5.63B | -1.5% | $0.28 | +47.4% | 14.4% | 7.2% | -$312M |
| FY2026 Q1 | $6.23B | +8.8% | $0.61 | +154.2% | 34.3% | 14.1% | $522M |
| FY2026 Q2 | $7.03B | -7.3% | $0.68 | +28.3% | 28.5% | 14.0% | – |
| FY2026 Q3 | $7.55B | +8.2% | $0.81 | +76.1% | 31.2% | 15.6% | – |
Management figures may use a non-GAAP, constant-currency, or adjusted basis.
No 8-K events recorded after the FY2025 Q3 call day (Nov 18, 2025) through Jan 22, 2026, inclusive.
| Analyst | Firm | Questions · challenging |
|---|---|---|
| Lawson Winder | Bank of America | 12 questions · 0% challenging |
| Daniel Major | UBS | 12 questions · 8% challenging |
| Bob Brackett | Bernstein | 10 questions · 10% challenging |
| Liam Fitzpatrick | Deutsche Bank | 10 questions · 20% challenging |
| Orest Wowkodaw | Scotiabank | 10 questions · 20% challenging |
| Bill Peterson | JPMorgan | 10 questions · 10% challenging |
| Katja Jancic | BMO Capital Markets | 9 questions · 22% challenging |
| Chris LaFemina | Jefferies | 9 questions · 22% challenging |
| Brian MacArthur | Raymond James | 9 questions · 0% challenging |
| Timna Tanners | Wells Fargo | 8 questions · 13% challenging |
| Firm | Analysts | Questions · challenging |
|---|---|---|
| Bank of America | 1 analyst | 12 questions · 0% challenging |
| UBS | 1 analyst | 12 questions · 8% challenging |
| Bernstein | 1 analyst | 10 questions · 10% challenging |
| Deutsche Bank | 1 analyst | 10 questions · 20% challenging |
| JPMorgan | 1 analyst | 10 questions · 10% challenging |
| Scotiabank | 1 analyst | 10 questions · 20% challenging |
| BMO Capital Markets | 1 analyst | 9 questions · 22% challenging |
| Jefferies | 1 analyst | 9 questions · 22% challenging |